What We Do
Water, gas and venting — planned as one installation
A gas tankless unit fires a burner only while hot water is running. To do that it needs a gas line sized for its full burner demand — often larger than the line that fed an old tank heater. At the heater we fit a shutoff and a drip leg (sediment trap) so debris in the line settles out before it reaches the gas valve.
Exhaust has to leave the building. The units in our photos vent through PVC pipe, which is what their design allows. Below the heater goes an isolation valve kit so the heat exchanger can be flushed of scale without disconnecting anything.
- Gas piping to the heater, with shutoff and drip leg
- PVC or manufacturer-specified venting to the outside
- Isolation (service) valve kit with flush ports
- Copper or PEX water connections
- Integration with whole-house filtration where the home has it