How Is a Shower Curb Waterproofed — Does the Liner Go Over the Curb, How High, and Can You Nail Through It?
In a traditional tiled shower the curb is waterproofed by the same pan liner as the floor: it runs up the inside of the curb, over the top and down the outside, and at the curb ends, where it has to be cut, a bonded dam corner covers the cut [3][4]. Florida’s code says the liner must turn up on all sides at least 2 inches above the finished threshold and must not be nailed or perforated anywhere less than 1 inch above it [1][2]. Mortar goes over the liner on the curb and tile over that [3].

Does the shower pan liner go over the curb?
Yes — over it, not up to it. Oatey’s printed instructions for its shower pan liner say the liner must be big enough to cover the floor completely, turn up all side walls at least 2 inches above the finished curb height, and adequately cover the curb [3]. Its drawing of the finished shower shows the liner running up the inside face of the curb, across the top and down the outside, with mortar and tile over it [3].
Oatey’s online guide builds the curb in two layers. A piece of scrap liner is stapled over the top and both exposed sides of the curb first; later the main liner is cut vertically at the inside corner and adhered horizontally over that scrap piece, and the outside of the curb is stapled again [4]. Oatey’s answer to the question of the best way to wrap a liner over a curb gives two methods: glue the liner to the front, back and top of the curb with an approved adhesive, or wrap the curb with a scrap piece of liner, nail it, and solvent-cement the finished liner to the scrap [5]. These are one maker’s instructions; Oatey is also the maker named for the liners in our two photographs.
The ends of the curb are the hard part. Where the liner meets the wall at the end of the curb it cannot simply fold, so it is cut. Oatey’s instructions say that for outside corners or curbs, where it is necessary to cut the pan liner, a dam corner covers the cut area, bonded with Oatey’s X-15 bonding adhesive [3]. Its online guide sticks dam corners to every intersection of curb and wall framing and adds that staples or screws are unnecessary with them [4].

How high above the threshold does the shower pan liner have to go?
At least 2 inches above the finished threshold, on every side. The Florida Building Code, Plumbing, §421.5.2 says shower liners shall turn up on all sides not less than 2 inches above the finished threshold level [1]. The Florida Building Code, Residential, §P2709.2 says the same 2 inches above finished thresholds, and adds that the lining must extend at least 2 inches beyond or around the rough jambs [2].
The finished threshold is the top of the finished curb. Florida’s residential code, §P2709.1, says a finished curb threshold must be at least 1 inch below the sides and back of the receptor, and the curb must be not less than 2 and not more than 9 inches deep, measured from the top of the curb to the top of the drain [2]. Our reading of the two rules together: the liner is measured from the finished curb, with tile on it, not from the bare framing — so it goes up the walls at least 2 inches higher than the tiled curb will be.
That is a minimum. Oatey’s printed instructions use the same 2 inches above the finished curb height [3]; its online guide sizes the liner from a mark five inches up from the curb on the wall framing [4]. Other liner makers ask for more; our article on what is under your shower floor covers the liner materials and their turn-up heights.
Can you nail or screw through the shower liner on the curb?
Not on the top or the inside of the curb. Florida’s plumbing code says liners shall not be nailed or perforated at any point less than 1 inch above the finished threshold, and must be recessed and fastened to an approved backing so they do not take up the space needed for the wall covering [1]. The residential code, §P2709.3, has the same 1-inch rule [2]. Our reading: since the finished threshold is the top of the curb, the whole curb sits below that line, so the code leaves no place on the curb for a nail through the finished liner.
The maker’s instructions keep fasteners away from the wet side too. Oatey’s printed instructions nail or staple the liner to the wall framing ½ inch below the upper edge of the material [3], and its online guide says to staple only in the top ½ inch of the liner [4]. On the curb, Oatey’s answer on wrapping the curb nails the glued liner at the top edges and on the outside curb surface, or nails only a scrap layer that the finished liner is then cemented over [5]; its dam corners need no staples or screws [4].
Oatey’s outside-face fasteners and the code’s “any point” do not line up word for word. Our reading: the curb details that put no fastener through the finished liner — the scrap-liner wrap, or a liner glued and held by mortar — satisfy both. Oatey itself makes the point about mortar: it says the use of mortar versus drywall for the curb should be considered, because mortar avoids nails in that part of the installation [3].
What goes on top of the liner on a shower curb?
Mortar, then tile. Oatey’s drawing of a finished shower shows concrete mortar wrapped over the liner on the curb and tile on top of that, the same as on the floor [3]. Its instructions suggest mortar rather than drywall for the curb so that no nails are needed there [3].
On the walls, Oatey’s instructions nail water-proof board to the studs to approximately 1 inch above the pan liner surface before the floor mortar goes in, and say to follow the board maker’s recommendation, because the installation height can vary with the material [3]. Whatever covers the curb and walls, the 1-inch rule still applies to every fastener in it [1][2].
On the floor, the liner gets a reinforced mortar bed at least 1½ inches thick, with pea gravel over the drain’s weep holes so the mortar does not completely cover them [3]. How the liner joins the drain is covered in our article on square, round and linear shower drains.
What goes wrong at a shower curb?
Four things, all of them details the liner rules above are written to prevent:
- A cut corner at the curb end with no dam corner. The cut is where the liner turns from the floor to the curb and wall; Oatey covers it with a dam corner bonded with adhesive [3][4].
- A fastener through the top or inside of the curb. The code forbids any nail or hole less than 1 inch above the finished threshold [1][2]; Oatey’s instructions keep fasteners at the liner’s top edge or on the outside of the curb [3][4][5].
- A liner that does not reach. Trimmed at the curb line, or less than 2 inches above the finished threshold, instead of turned up and over [1][2][3].
- Holes made later. Our reading of the code’s “at any point”: a screw for a glass panel, a door jamb or a curb cap driven low through the liner is the same hole as a nail put there when the liner went in [1].
If you think an existing curb is already leaking, the signs, how each one is checked and when a pan has to be rebuilt are in our article on signs of a leaking shower pan.
How is the curb checked before the tile goes on?
With water, filled up toward the top of the curb. Florida’s plumbing code requires the completed liner to be tested under its §312.9 [1]. Oatey’s printed instructions plug the drain, fill the shower floor with water to just below the top of the curb and let it sit for 4 hours, then repair and re-test until it is leak free [3]; its online guide fills to a height equal to the curb, for at least two hours [4]. Because the water stands right up against the inside of the curb, the test checks the curb corners and the curb face along with the floor.
Can a shower be built without a curb?
Yes — Oatey describes a linear drain, with the floor sloped one way to it and no barrier to cross, as suited to curbless showers [6]; how that floor differs is in our article on square, round and linear shower drains.
What this means in Belleair Beach, South Pasadena and across Tampa Bay
Florida has one statewide building code, and the curb rules on this page come from its 8th edition (2023), the Plumbing and Residential volumes [1][2].
The two photographs are liners we installed. The first is in new wood framing in Belleair Beach: a grey 40 mil Oatey PVC liner wrapped over the front of a low curb, black preformed corner pieces at the curb ends, and the drain in the middle with a yellow test cap and a red tag. The second is in South Pasadena: the liner turned up the back wall and wrapped over the front curb, black corners at the curb ends, the drain with a green strainer, open studs and old copper pipe at the left. That is the stage at which the curb can still be seen and checked. If you are planning a tiled shower and want the pan liner done over the floor and curb before the tile goes on, call 727-470-7126.
Tell us the shower size, the tile and where the door or glass goes. Kate, our AI voice assistant, answers the phone 24/7 and takes the request; overnight requests are reviewed first thing in the morning, and site work is Monday to Friday, 8am to 6pm. We speak English and Russian.
Call 727-470-7126FAQ
Do you wrap the shower pan liner over the curb?
Yes. Oatey’s instructions have the liner adequately cover the curb, and its drawing shows it up the inside face, over the top and down the outside, with mortar and tile on it [3].
How high should a shower pan liner go above the curb?
Florida’s code says at least 2 inches above the finished threshold, on all sides [1][2]. Oatey’s printed instructions say at least 2 inches above the finished curb height [3].
Can I nail the shower pan liner on top of the curb?
No. The Florida code forbids nailing or perforating the liner at any point less than 1 inch above the finished threshold [1][2]. Oatey offers a glued wrap, or a nailed scrap layer with the finished liner cemented over it [5].
Can I screw a glass panel or door into the shower curb?
Not through the liner below 1 inch above the finished threshold — the code says “at any point” [1][2]. Our reading: a screw put in later is the same hole as a nail put in during the build.
What are dam corners in a shower?
Preformed corner pieces that cover the cut where the liner turns at an outside corner or curb end. Oatey bonds them with X-15 adhesive and says staples or screws are unnecessary [3][4].
Do you use mortar or backer board on a shower curb?
Oatey’s instructions suggest mortar over drywall for the curb, because mortar avoids nails there, and its drawing shows mortar over the liner on the curb with tile on top [3].
How tall does a shower curb have to be?
Florida’s residential code sets the curb at 2 to 9 inches deep, measured from the top of the curb to the top of the drain, with the finished threshold at least 1 inch below the sides and back [2].
Sources
We review and cite. We do not reproduce a paper or a manual — follow the links for the originals.
- [1]Florida Building Code, Plumbing, 8th Edition (2023) — §421.5.2 Shower lining — Florida Building Commission / International Code Council · 2023Law / code · floors under shower compartments, except prefabricated receptors, lined and made water tight; liners “shall turn up on all sides not less than 2 inches (51 mm) above the finished threshold level”; recessed and fastened to an approved backing so as not to occupy the space for wall covering; “shall not be nailed or perforated at any point less than 1 inch (25 mm) above the finished threshold”; pitched 2 % toward the drain; completed liner tested per §312.9 (§312.9 itself not read). Text read on UpCodes (https://up.codes/viewer/florida/fl-plumbing-code-2023/chapter/4/fixtures-faucets-and-fixture-fittings), labelled 2023 FBC – Plumbing, 8th edition; read 2026-11-16
- [2]Florida Building Code, Residential, 8th Edition (2023) — §P2709.1 Construction, §P2709.2 Lining required, §P2709.3 Installation — Florida Building Commission / International Code Council · 2023Law / code · P2709.1: a finished curb threshold not less than 1 in below the sides and back of the receptor; curb not less than 2 in and not more than 9 in deep, measured from the top of the curb to the top of the drain; P2709.2: lining extends not less than 2 in beyond or around the rough jambs and not less than 2 in above finished thresholds; P2709.3: lining sloped ¼ in per 12 in to the weep holes, recessed and fastened to approved backing, not nailed or perforated at any point less than 1 in above the finished threshold. Text read on UpCodes (https://up.codes/viewer/florida/fl-residential-code-2023/chapter/27/fixtures), labelled 2023 FBC – Residential, 8th edition; read 2026-11-16
- [3]Shower Pan Liner — Application Instructions (LCS993 7/16) — Oatey Co. · 2016Manufacturer's manual · step 3: liner sufficient to cover the floor, turn up all sidewalls at least 2 in above the finished curb height and adequately cover the curb; step 5: adhesive optional to bond liner to floor and curb, fold corners, nail or staple ½ in below the upper edge; step 6: for outside corners or curbs where the liner must be cut, a dam corner covers the cut, bonded with X-15; step 8: flood with water just below the top of the curb for 4 hours, repair and re-test; step 10: water-proof board nailed to approximately 1 in above the pan liner surface, follow board maker; note: mortar vs drywall for the curb should be considered because it avoids nails; step 11: pea gravel over weep holes, minimum 1-1/2 in reinforcement mortar bed; Figure A shows concrete mortar over the liner wrapped over the curb, tile on top. Image-only PDF, read page by page; one maker’s instructions; Oatey is the maker named for the liners in our photographs; read 2026-11-16
- [4]How to Install a Shower Pan Liner — Oatey Co.Manufacturer's manual · manufacturer’s project guide: step 3 staple a scrap piece of liner over the top and both exposed sides of the curb; step 4 mark five inches up from the curb on the wall framing to size the liner; step 7 fold corners, staples only in the top ½ in of the liner; step 8 cut the liner vertically at the inside corner, adhere it horizontally over the scrap liner, staple the outside of the curb again; step 9 dam corners stuck with X-15 or Oateyweld to every curb-to-wall intersection, “Staples or screws are unnecessary”; step 10 flood test at a height equal to the curb, at least two hours; read 2026-11-16
- [5]What is the best way to wrap a shower pan liner over a curb? — Oatey Co.Manufacturer's manual · manufacturer’s FAQ, undated: two methods — (1) approved adhesive troweled up the front, back and top of the curb, liner pressed to the curb shape, nailed at the top edges and on the outside curb surface; (2) wrap all three sides of the curb with a scrap piece of liner and nail it anywhere, nails flush or recessed, then solvent-cement the finished liner to the scrap; read 2026-11-16
- [6]Linear vs. center square drains: Five considerations to drive your choice — Oatey Co. · 2022Manufacturer's manual · manufacturer’s article: a linear drain’s single slope suits curbless enclosures, with no barrier to cross; read 2026-11-16
Questions About Your Own System?
Send a photo of what you have. We answer with what it is and what it needs.
See our PEX-A Shower & Tub Rough-In service →
Licensed CFC1432506 · Insured · Clearwater, FL + 50 miles
