Where Can You Nail a Shower Pan Liner — on Wood Studs, Steel Studs or a Concrete Block Wall?
Only high on the wall, along the liner’s top edge, into studs or blocking. The Florida Building Code says a shower liner must not be nailed or perforated at any point less than 1 inch above the finished threshold, and must be recessed and fastened to approved backing so it does not take up the space of the wall covering [1][2]. Liner makers are stricter: Oatey says to put staples only in the top half inch of the liner [3], and Noble says nails or staples in the top inch [7]. On a concrete block wall Noble lists masonry nails, screws with washers or its sealant; on steel studs with no backing, sheet-metal screws with washers [7].

Where can you nail a shower pan liner?
Along its top edge and nowhere else, into the studs or the blocking behind it. Everything below that line is the part of the liner that holds water, so a nail there is a hole in the pan.
Oatey’s installation guide says to staple the liner to the wall framing and to add staples only to the top half inch of the liner, for maximum waterproof protection [3]. Noble’s instructions for its PVC liner say to secure it to the backing or studs with nails or staples in the top inch of the turned-up membrane [7]. The Florida Building Code sets the floor under both: no nail or hole at any point less than 1 inch above the finished threshold [1][2]. The code’s inch is the legal minimum; the makers’ top-edge rule is the one to build to, and we read the two together that way.
On the curb the liner is fastened on the outside face — Noble’s instructions take the liner over the top of the curb and fasten it on the outside [7]; how the curb itself is made watertight is its own subject, covered in how a shower curb is waterproofed.
What does the Florida Building Code say about nailing a shower liner?
Two things, in one sentence of each code book. The Florida Building Code, Plumbing (8th edition, 2023), §421.5.2, says liners shall be recessed and fastened to an approved backing so as not to occupy the space required for the wall covering, and shall not be nailed or perforated at any point less than 1 inch above the finished threshold [1]. The Florida Building Code, Residential, says the same in §P2709.3 [2].
The same sections set the turn-up: the Plumbing code says liners turn up on all sides at least 2 inches above the finished threshold level [1], and the Residential code says the lining extends at least 2 inches above finished thresholds and at least 2 inches beyond or around the rough jambs [2]. So by code alone, the band between 1 and 2 inches above the threshold is the only place a fastener could legally go on a minimum-height liner — which is why liners are taken much higher than the minimum and fastened at the top.
The “finished threshold” is the top of the finished curb or the step into the shower, not the shower floor. How high liner makers ask for the turn-up, and the rest of what the code says about liners, is in what is under your shower floor.
How high up the wall do the staples go?
At the top of the turn-up, so the height of the staples is set by how high the liner goes. Oatey’s answer for its liner is a minimum of 6 inches above the framed (roughed-in) curb height [5]; Noble’s instructions ask for an upturn 3 inches above the finished dam, or as specified or required by code [7]. Staples go in the top half inch (Oatey) or top inch (Noble) of whatever height that is [3][7].
Folded inside corners get the same treatment. Oatey’s answer for folding a corner is to cement the leftover triangle of liner into a flap, cement the flap flat against one wall, then nail or staple the top of the flap to a stud [5]. The drawing below shows the zones on one wall.
Do you need blocking between the studs for a shower pan liner?
It is recommended. Noble’s instructions say blocking between studs is recommended to support the upturned membrane [7], and the code asks for the liner to be fastened to an approved backing [1]. With blocking, the top edge of the liner is backed all the way along, not only where it crosses a stud.
The liner also has to be recessed so the wall board goes on flat over it. That is the code’s wording — recessed so it does not occupy the space required for the wall covering [1][2]. Noble’s hint is to notch the studs at each corner about ⅛ inch, which leaves room for the folded corners and keeps the backer board from bowing [7].
The board that laps over the liner brings its own fasteners. Oatey’s tips say that when attaching cement board to walls and curbs, nails or screws should go no lower than four inches above the flood rim or the top of the curb [6].
The second photograph is a liner we installed in Belleair Beach: a wide liner along a wall lined with rigid insulation board, turned up the studs at the back and wrapped over the front curb, with the drain in the middle of the floor. The board printed with R-values is visible on the left.

How do you attach a shower pan liner to a concrete block wall?
With masonry fasteners or sealant, still only at the top edge. Noble’s instructions say that where walls are concrete or block, use masonry nails, screws with washers, or its NobleSealant 150, following the label [7].
The Oatey documents we read — its installation guide, its liner FAQ and its curb answer — describe framed walls and do not say how to fasten a liner to masonry [3][4][5]. So for an Oatey liner on a block wall, there is no Oatey instruction we can point to; the code rule applies either way: nothing less than 1 inch above the finished threshold, and the liner recessed so the wall covering is not pushed out [1][2].
The photograph at the top of this page, taken in Indian Shores, shows that situation: the liner turned up against a concrete-block wall on the right and against steel-stud framing at the back, and wrapped over the curb at the front, with a square drain grate at the left. The sheet is printed “Oatey” and “40 mil PVC”.
How do you fasten a shower pan liner to steel studs?
With sheet-metal screws and washers, at the top edge, when there is no backing behind the liner. Noble’s instructions say that where metal studs are used and no backup material is provided, use sheet-metal screws and washers, folding the top inch of the liner over for extra strength before fastening it to the studs [7].
For the folded corners on metal studs, Noble says the backer board can be shimmed slightly to make room for them, where on wood studs it suggests notching [7].
Oatey’s installation guide is written for staples into wall framing [3]; we did not find an Oatey instruction specific to steel studs.
What happens if a shower pan liner is nailed too low?
The pan leaks at that hole. Oatey lists penetrating the waterproof membrane or liner as a common error that can lead to shower failure, because water will migrate through any holes, reaching the framing and the surfaces behind it [6].
If a liner has been punctured below the waterline, Noble’s instruction for its liner is a patch of the same material 2 inches larger than the damage on all sides, sealed over the hole with its sealant or seam cement, and testing again in accordance with local plumbing codes [7]. Once the mortar bed and tile are on, a hole that low is no longer reachable from above.
What this means in Indian Shores, Belleair Beach and across Tampa Bay
Florida uses one statewide building code, and the fastening rule on this page comes from its 8th edition (2023), in the Plumbing and the Residential volumes [1][2]. Pinellas beach towns and Clearwater build under the same text.
Both photographs on this page are of our own work: a liner turned up against a block wall and steel studs in Indian Shores, and a liner along an insulated wall in Belleair Beach. Both were photographed at the stage when the turn-ups are still visible, before the mortar bed and tile. If you are rebuilding a shower and want the pan done before the tile setter arrives, call 727-470-7126.
Tell us what the shower walls are made of — wood studs, steel studs or block. Kate, our AI voice assistant, answers the phone at any hour and takes the request; site work is scheduled Monday to Friday, 8am to 6pm. We speak English and Russian.
Call 727-470-7126FAQ
Can you staple a shower pan liner to the studs?
Yes, at the top edge. Oatey’s guide says to staple the liner to the wall framing and only in the top half inch of the liner [3]; Noble allows nails or staples in the top inch [7].
How far above the curb can you nail a shower pan liner?
The Florida code forbids any nail or hole less than 1 inch above the finished threshold [1][2]. In practice the fasteners go at the very top of the turn-up, which liner makers set well above that — Oatey says at least 6 inches above the framed curb [5].
Do you have to notch the studs for a shower pan liner?
The code asks for the liner to be recessed so it does not take the wall covering’s space [1][2]. Noble suggests notching the studs at each corner about ⅛ inch for the folded corners, or shimming the backer board on metal studs [7].
Can you glue a shower pan liner instead of nailing it?
Partly. Oatey names three Liquid Nails adhesives approved for its liners, but says the liner must not be glued to a wood sub-floor [5]. On block walls Noble lists its sealant as an alternative to masonry fasteners [7].
How do you attach a shower pan liner to a block wall?
Noble’s instructions: masonry nails, screws with washers, or NobleSealant 150, at the top edge [7]. The Oatey documents we read do not cover masonry [3][4][5].
How low can the cement board screws go over a pan liner?
Oatey says not lower than four inches above the flood rim or the top of the curb when attaching cement board to walls and curbs [6].
Sources
We review and cite. We do not reproduce a paper or a manual — follow the links for the originals.
- [1]Florida Building Code, Plumbing, 8th Edition (2023) — §421.5.2 Shower lining — Florida Building Commission / International Code Council (read on UpCodes) · 2023Law / code · §421.5.2: floors under shower compartments lined and made watertight except where prefabricated receptors are provided; liners turn up on all sides not less than 2 inches above the finished threshold level; liners shall be recessed and fastened to an approved backing so as not to occupy the space required for wall covering, and shall not be nailed or perforated at any point less than 1 inch above the finished threshold; read 2026-11-16
- [2]Florida Building Code, Residential, 8th Edition (2023) — §P2709.2 Lining required and §P2709.3 Installation — Florida Building Commission / International Code Council (read on UpCodes) · 2023Law / code · P2709.2: lining extends not less than 2 inches beyond or around the rough jambs and not less than 2 inches above finished thresholds; P2709.3: lining properly recessed and fastened to approved backing so as not to occupy the space required for the wall covering, not nailed or perforated at any point less than 1 inch above the finished threshold; read 2026-11-16
- [3]How to Install a Shower Pan Liner (project guide) — Oatey Co. · 2022Manufacturer's manual · fold corners and staple liner to wall framing; only add staples to the top ½ in. of liner for maximum waterproof protection; staple the curb piece over the top and both exposed sides of the curb, and staple the outside of the curb again after adhering the finished liner; let the test water sit at least two hours; does not address blocking, notching, masonry or steel studs; published 2022-10-17; read 2026-11-16. Oatey is the name printed on the liner in our Indian Shores photograph
- [4]What is the best way to wrap the shower pan liner over the curb? (FAQ) — Oatey Co.Manufacturer's manual · two methods: an approved Liquid Nails adhesive troweled over the curb, liner pressed on and nailed at the top edges and the outside curb face; or a scrap piece of liner wrapped over the curb and nailed, nails flush or recessed, then the finished liner solvent-cemented to it; no masonry guidance; undated; read 2026-11-16
- [5]FAQs — Shower Pan Liners — Oatey Co. (PDF hosted by a retailer, WebstaurantStore) · 2023Manufacturer's manual · approved adhesives: Liquid Nails LN-609, LN-715, LN-915; the liner should finish a minimum of 6 in above the framed (roughed-in) curb height; the liner cannot be glued to the wood sub-floor; inside corners: cement the triangle into a flap, cement the flap to the straight wall, then nail/staple the top of the flap to a stud; no tar paper under the liner; PDF metadata created 2019-12-20, modified 2023-01-13; read 2026-11-16
- [6]Shower Installation and Waterproofing: Tips & Common Errors — Oatey Co. · 2021Manufacturer's manual · penetrating the waterproof membrane or liner is a common error that can lead to shower failure — water migrates through any holes to the framing and surfaces behind; when attaching cement board to walls and curbs, no nails or screws lower than four inches above the flood rim or the top of the curb; staples only in the top half inch of liner; published 2021-07-26; read 2026-11-16
- [7]Noble PVC Shower Pan Liner — Installation Instructions (File #SP052020-03, 05/20) — Noble Company (PDF hosted by a retailer, Master Wholesale) · 2020Manufacturer's manual · 4.2 blocking between studs recommended to support upturned membrane; hint: notch studs at each corner about 1/8 in for folded corners and to stop backer board bowing, with metal studs shim the backer board; 5.2 upturn 3 in above the finished dam or floodplane, flashed behind the backer board; 5.4 nails or staples in top 1 in of the membrane, upturn at dam over the top and fastened on the outside face; metal studs without backup: sheet-metal screws and washers, top folded over 1 in; concrete or block walls: masonry nails, screws with washers or NobleSealant 150; 5.7 patch 2 in larger on all sides for a penetration below the waterline; 5.9 test per local plumbing codes; one maker’s instructions, not a brand visible in our photographs; read 2026-11-16
Questions About Your Own System?